Connect with us

Abuja Reports

FCTA Activates Emergency Response Centre as Cholera Threat Raises Concern Ahead of Yuletide

Published

on

By Patrick Idowu

The Federal Capital Territory Administration (FCTA) has activated its Multisectoral Cholera Emergency Operations Centre to contain the outbreak, prevent further infections and avert deaths ahead of the Yuletide season.

The activation, carried out on Wednesday, was announced in a statement issued on Thursday. Director of Public Health, Dr Teresa Nwanchukwu, activated the centre on behalf of the Mandate Secretary for Health, Dr Adedolapo Fasawe.

The FCT State Epidemiologist, Dr Lawal Ademola, has been appointed Incident Manager to coordinate the response and implement the approved Cholera Incident Action Plan.

The intervention will focus on disease surveillance, active case searches, laboratory testing, treatment, vaccination where necessary, improved sanitation, safe water supply and public awareness.

Development partners, including WHO, UNICEF, Jhpiego, Pro-Health International and the Nigerian Red Cross Society, have pledged support for the response.

The FCTA urged residents to drink safe water, maintain proper hygiene, eat well-cooked food and avoid open defecation. Residents experiencing sudden watery diarrhoea, with or without vomiting, were advised to take oral rehydration solution (ORS) and immediately visit the nearest health facility.

The administration assured residents of its commitment to containing the outbreak and called for public cooperation in observing preventive measures.

Complaints concerning the emergency response can be directed to the FCT State Epidemiologist, Dr Lawal Ademola, on 09084000085.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Abuja Reports

Tinubu Unveils ₦100m, Abuja Houses for Families of 25 Victims in Major Relief Package

Published

on

By Patrick Idowu

President Bola Tinubu has announced a major welfare package for the families of those who lost their lives in the October 5 Nigerian Air Force aircraft crash in Igbokoda, Ondo State, approving financial compensation of ₦100 million and three-bedroom houses for the bereaved families.

The President made the announcement during a memorial service held in honour of the 25 victims, comprising military personnel and civilians who died in the tragic incident.

Under the arrangement, the families of the deceased military personnel will receive three-bedroom apartments under the Federal Government’s Renewed Hope Housing Project in Abuja. The President also extended the housing gesture to the immediate families of civilians who were aboard the aircraft.

Tinubu described the intervention as a national responsibility to honour those who lost their lives in service to the country, acknowledging that no amount of financial assistance or material support could replace the loved ones their families had lost.

He also approved ₦100 million for each of the 19 deceased military personnel, describing the package as part of his administration’s commitment to supporting families left behind by fallen service members.

The President assured the bereaved families that government assistance would not end with the memorial ceremony, stressing that their welfare and long-term support must remain a national priority.

Beyond the compensation, Tinubu pledged a comprehensive investigation into the circumstances surrounding the October 5 crash, promising that the findings would lead to stronger aviation safety measures, improved operational procedures and greater institutional accountability.

He said the government was determined to establish the facts behind the tragedy, learn from the incident and prevent similar occurrences in the future.

Tinubu also reiterated his commitment to strengthening the Armed Forces through improved equipment, modern technology, specialised training and better welfare for military personnel.

He urged the families to take pride in the contributions and sacrifices of the deceased, assuring them that the nation would continue to honour their service and preserve their memories.

Continue Reading

Abuja Reports

Senate Raises Alarm Over LPG Shortage, Vows Action to Crash Cooking Gas Prices

Published

on

By Patrick Idowu

The Nigerian Senate has raised concerns over the inadequate supply of Liquefied Petroleum Gas (LPG), popularly known as cooking gas, to the domestic market, warning that persistent shortages could worsen the financial burden on households already struggling with high energy costs.

Chairman of the Senate Committee on Gas Resources, Senator Agom Jarigbe, disclosed this on Wednesday during an engagement with stakeholders in the gas industry at the National Assembly.

The meeting focused on export revenue remittances and the availability of LPG for domestic consumption, amid growing concerns over the affordability of cooking gas across the country.
Jarigbe, who represents Cross River North Senatorial District, said the committee was determined to investigate the factors responsible for the inadequate domestic supply and develop measures to ensure that Nigerians have access to cooking gas at affordable prices.

He maintained that increasing supply to meet domestic demand would help drive down prices and ease the economic pressure on households.
“We are already working for Nigerians here, for our people, and that’s why we want to get to the root of it,” the senator said.
He added that the committee would ensure that efforts were made to reduce cooking gas prices, stressing that adequate supply in response to demand would naturally encourage price reductions.

The senator also disclosed that industry operators had identified the ratio of propane to butane in LPG as one of the factors influencing decisions to export the product.

The committee’s intervention comes amid persistent concerns over the affordability of cooking gas, which remains an important household energy source for millions of Nigerians.

Jarigbe said the Senate was committed to engaging relevant industry players to address supply challenges and ensure that domestic consumers are not disadvantaged by export-related decisions.
He stressed the need to strike a balance between the country’s gas export activities and the availability of sufficient supplies for local consumption.

Continue Reading

Abuja Reports

Mararaba Traders, Drivers Groan as Flyover Construction Hits Businesses

Published

on

By Patrick Idowu

The ongoing construction of twin flyovers along the Abuja-Keffi Expressway has plunged traders, commercial drivers and tricycle operators in Mararaba, Nasarawa State, into mounting economic hardship, with many reporting sharp declines in daily earnings, rising operating expenses and dwindling customer patronage.

For businesses operating around the busy Mararaba corridor, what is expected to become a major transportation improvement has temporarily turned into a difficult period of survival, as persistent traffic congestion, construction dust, damaged access roads and stagnant dirty water continue to disrupt commercial activities.

Several traders who spoke to Abuja City Journal said their daily sales had dropped by more than half since construction activities intensified, while transport operators complained that longer journeys, increased fuel consumption and frequent vehicle repairs were eating deeply into their already shrinking profits.

The concerns come as Triacta Nigeria Limited, the construction firm handling the ₦39 billion project, announced that it was targeting March 2027 for overall completion, with asphalt binder works expected to be concluded by January.

The company disclosed its construction timeline in an update published on its Facebook page, Triacta North Central, on Thursday, November 19, alongside photographs showing ongoing work at the project site.

According to the contractor, construction activities were progressing, with asphalt binder works scheduled for completion by January and the entire project expected to be delivered in March 2027.

Awarded by the administration of Governor Abdullahi Sule and officially flagged off in December 2025, the project covers approximately 2.6 kilometres and involves the construction of twin flyovers and connecting elevated roads.

The infrastructure is designed to address longstanding traffic congestion along the Mararaba axis, one of the busiest transportation corridors linking Nasarawa State with the Federal Capital Territory.

However, while residents and road users anticipate improved connectivity upon completion, the immediate economic consequences of the construction have become a major source of concern for small business owners and transport workers whose livelihoods depend on the daily movement of people and goods.

Businesses struggle as customers disappear

At Mararaba Market, traders say the combination of dust, traffic bottlenecks and difficult access to business premises has significantly affected their ability to attract customers.

A provision seller, Emeka Juliet, who has operated in the market for six years, told Abuja City Journal that her daily sales had fallen from approximately ₦20,000 to just ₦8,000.

She said the difficult road conditions had discouraged customers from visiting the market, leaving her with unsold goods and increasing the possibility of losses.

“Before, customers used to come easily. Now, because of traffic and dust, customers are no more coming. My goods are getting spoilt,” she lamented.

Although she acknowledged the importance of the road project, Juliet appealed to the government and construction company to accelerate the work to prevent small businesses from suffering further losses.

“We want good roads; nobody hates good roads. But please finish it quickly. We are suffering. We have families to feed,” she said.

The situation is particularly difficult for traders dealing in perishable agricultural products, who say dust and contaminated water around the construction areas are damaging their merchandise.

A pepper seller, Mama Aisha, who has spent about 10 years in the business, disclosed that her daily sales had dropped from ₦15,000 to approximately ₦5,000.

She explained that dust settles on her pepper, while dirty water around the market further compromises the condition of her produce.

“Every day, I throw pepper away. Dust affects my pepper. Dirty water from construction also affects it,” she said.

Similarly, a tomato seller, Aunty Blessing, said her daily turnover had declined from ₦18,000 to about ₦6,000, blaming the surrounding conditions for the rapid deterioration of her produce and declining customer patronage.

According to her, some customers now avoid the area because of the difficult trading environment.

“Every day, I throw spoilt tomatoes away. Customers now run away because they say Mararaba is too dirty. We just sit down, no customers, and our tomatoes are spoiling,” she lamented.

The construction has also affected non-food vendors.

David Abraham, a clothes seller who has operated along the roadside in Mararaba for four years, said dust from the construction site had made it increasingly difficult to maintain the quality and appearance of his merchandise.

He disclosed that his daily sales had dropped from ₦20,000 to approximately ₦7,000, noting that customers were reluctant to purchase clothes covered in dust.

“Customers say my clothes are dirty. Some go to other places to buy. I sit down with dusty clothes and no money,” he said.

Transport operators count mounting losses

Beyond the trading community, commercial drivers and tricycle operators say the construction has fundamentally changed the economics of operating along the Mararaba-Abuja corridor.

Ibrahim Musa, a commercial driver who has operated on the Mararaba-Wuse route for eight years, said journeys that previously took about 30 minutes now require between two and three hours because of traffic congestion.

He explained that the longer travel time had increased his daily fuel expenditure from approximately ₦10,000 to ₦20,000, without a corresponding increase in earnings.

“My vehicle is getting spoilt every day because of potholes and stones on the road. Every week, I am at the mechanic,” he said.

Musa added that the situation had become more difficult because some passengers were abandoning the route in favour of alternative transportation arrangements.

He said some commuters now trekked towards the checkpoint to board vehicles operating from less congested locations, while others had stopped using the route altogether.

“Some now trek far towards the checkpoint to enter another bus, while others have stopped coming this way. We carry half load, but burn full fuel,” he said.

The driver described the situation as financially unsustainable, explaining that increased fuel consumption, vehicle maintenance and reduced passenger numbers had combined to erode his daily income.

For tricycle operators, the experience is similarly challenging.

Bola Emmanuel, who operates along the Mararaba-Nyanya route, said a journey that previously lasted approximately 15 minutes now takes close to an hour.

He disclosed that his daily fuel expenditure had doubled from ₦5,000 to ₦10,000, while poor road conditions and prolonged journeys had reduced the number of trips he could complete each day.

He said the additional maintenance costs were further reducing the income available to support his family.

Residents seek urgent intervention

The affected traders and transport operators are not opposed to the infrastructure project, acknowledging that the completed flyovers could improve traffic movement and strengthen connectivity between Nasarawa State and Abuja.

However, they insist that the immediate economic burden should not be ignored while construction continues.

They called on the Nasarawa State Government and the contractor to introduce practical measures to reduce the hardship, including regular water spraying to control dust, proper drainage to prevent stagnant water, improved road access to business premises and the provision of clearly accessible alternative routes.

They also appealed for more effective traffic management to reduce the time motorists spend navigating the construction corridor.

For traders dealing in perishable goods, they said urgent attention to drainage and sanitation would help reduce avoidable losses, while commercial drivers want damaged sections of access roads addressed to minimise vehicle breakdowns.

With the contractor projecting March 2027 as the completion date, the affected business owners face several more months of uncertainty.

While the twin flyovers are expected to deliver long-term transportation benefits, traders and transport operators in Mararaba say the immediate priority is ensuring that the construction does not permanently damage the livelihoods of those whose businesses depend on the corridor.

Their message to the authorities is clear: the people welcome development, but they should not be left to bear its economic consequences without adequate support.

Continue Reading

Trending

taraftarium24seo ajansıseo ajansımarsbahistaraftarium24dizipalgiftcardmall/mygiftjustin tvjojobetGrandpashabetmarsbahisbetciotaraftarium24taraftarium24rojadirectajustin tvdinamobetjojobetdinamobetdinamobetTipobettipobetMatadorbetMatadorbetgrandpashabetjojobetholiganbetsekabetimajbetjojobet girişcasibomholiganbetcasibomgrandpashabetjojobetgrandpashabetholiganbetholiganbetholiganbetholiganbet girişholiganbet girişsahabetgrandpashabetgrandpashabetonwincasinolevantcasinolevantbettiltgrandpashabetjojobetjojobetbets10holiganbetholiganbetpusulabetonwinmarsbahisGrandpashabetholiganbetjojobetMatadorbetsahabetbahiscomnesinecasino xwbahis xbetgaranti xgrandpashabet girişGrandpashabetjojobetjojobetjojobetjojobetjojobetpusulabetmrkingcasino sitelerimarsbahis