{"id":68793,"date":"2025-06-23T11:00:55","date_gmt":"2025-06-23T11:00:55","guid":{"rendered":"https:\/\/abujacityjournal.com\/livenews\/?p=68793"},"modified":"2025-06-23T11:00:55","modified_gmt":"2025-06-23T11:00:55","slug":"power-restored-in-north-east-as-tcn-reconnects-region-to-national-grid","status":"publish","type":"post","link":"https:\/\/abujacityjournal.com\/livenews\/2025\/06\/23\/power-restored-in-north-east-as-tcn-reconnects-region-to-national-grid\/","title":{"rendered":"Power Restored in North-East as TCN Reconnects Region to National Grid"},"content":{"rendered":"<p>By Adenike Lawal<\/p>\n<p>Electricity has been fully restored to Nigeria\u2019s North-East following a prolonged blackout, as the Transmission Company of Nigeria (TCN), completed the integration of the new 330\/132kV Bauchi Transmission Substation into the national grid.<\/p>\n<p>In a statement on Sunday, TCN\u2019s General Manager of Public Affairs, Ndidi Mbah, said the substation was energized via the Jos-Bauchi-Gombe transmission corridor, restoring bulk power supply to the region\u2019s six states.<\/p>\n<p>The reconnection was completed at about 4:45 p.m. on June 19.<\/p>\n<p>The outage stemmed from a scheduled shutdown to facilitate the energizing of the newly built Bauchi facility, one of the largest in the North-East.<\/p>\n<p>Mbah warned that ongoing vandalism of transmission infrastructure remains a serious threat to power stability.<\/p>\n<p>She described 2024 and 2025 as especially challenging due to frequent attacks on towers and lines.<\/p>\n<p>With a network of over 16,000 km of transmission lines, 57 major substations, and more than 41,000 towers, TCN maintains the backbone of Nigeria\u2019s electricity grid, currently capable of wheeling 8,700 megawatts.<\/p>\n<p>The company urged local communities to help protect national power infrastructure, stressing that sustained electricity supply requires collective responsibility.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Adenike Lawal Electricity has been fully restored to Nigeria\u2019s North-East following a prolonged blackout, as the Transmission Company of Nigeria (TCN), completed the integration of the new 330\/132kV Bauchi Transmission Substation into the national grid. In a statement on Sunday, TCN\u2019s General Manager of Public Affairs, Ndidi Mbah, said the substation was energized via [&hellip;]<\/p>\n","protected":false},"author":29,"featured_media":68794,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[172],"tags":[],"class_list":["post-68793","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"aioseo_notices":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/posts\/68793","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/comments?post=68793"}],"version-history":[{"count":1,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/posts\/68793\/revisions"}],"predecessor-version":[{"id":68795,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/posts\/68793\/revisions\/68795"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/media\/68794"}],"wp:attachment":[{"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/media?parent=68793"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/categories?post=68793"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/tags?post=68793"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}