{"id":59708,"date":"2025-01-17T18:59:29","date_gmt":"2025-01-17T18:59:29","guid":{"rendered":"https:\/\/abujacityjournal.com\/livenews\/?p=59708"},"modified":"2025-01-17T18:59:29","modified_gmt":"2025-01-17T18:59:29","slug":"fresh-power-outage-hits-abuja","status":"publish","type":"post","link":"https:\/\/abujacityjournal.com\/livenews\/2025\/01\/17\/fresh-power-outage-hits-abuja\/","title":{"rendered":"Fresh Power Outage Hits Abuja"},"content":{"rendered":"<p>Residents of Abuja have been plunged into darkness following a fault in the 132-kilovolt (kV), transmission lines from Katampe to the AT5 Central Area Transmission Station, the Abuja Electricity Distribution Company (AEDC), announced on Friday, January 17.<br \/>\nIn a statement on its official X account, AEDC listed the affected areas as Federal Secretariat, Wuse Zones 1-7, Central Mosque, Energy Commission, Transcorp Hotel, Eagle Square, Yar\u2019adua Centre, Central Area, Maitama, Kado Estate, parts of Jabi, and several Garki districts.<br \/>\n\u201cThe power outage being experienced is due to a fault on the 132kV Lines 182 from Katampe to AT5 Central Area Transmission Station.<br \/>\n&#8220;The TCN team is currently investigating the cause and working to restore supply as soon as possible,\u201d the statement read.<br \/>\nThe Transmission Company of Nigeria (TCN), is working to determine the root cause of the blackout.<br \/>\nHowever, AEDC did not provide a timeline for restoration.<br \/>\nReports indicate the outage extends beyond the listed areas, with parts of Dawaki and Dutse Zone 7 experiencing disruptions for over a day.<br \/>\nThis follows AEDC\u2019s earlier announcement of a two-week power disruption in Abuja and Nasarawa State due to the relocation of key TCN infrastructure, including the 33kV DC Airport Feeder and 132kV Kukwaba-Apo Transmission Line Towers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Residents of Abuja have been plunged into darkness following a fault in the 132-kilovolt (kV), transmission lines from Katampe to the AT5 Central Area Transmission Station, the Abuja Electricity Distribution Company (AEDC), announced on Friday, January 17. In a statement on its official X account, AEDC listed the affected areas as Federal Secretariat, Wuse Zones [&hellip;]<\/p>\n","protected":false},"author":29,"featured_media":59394,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[177],"tags":[531,59],"class_list":["post-59708","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-abuja-reports","tag-aedc","tag-featured"],"aioseo_notices":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/posts\/59708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/comments?post=59708"}],"version-history":[{"count":1,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/posts\/59708\/revisions"}],"predecessor-version":[{"id":59709,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/posts\/59708\/revisions\/59709"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/media\/59394"}],"wp:attachment":[{"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/media?parent=59708"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/categories?post=59708"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abujacityjournal.com\/livenews\/wp-json\/wp\/v2\/tags?post=59708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}